Hospitals | Clinics | Pharmaceutical
HEALTH
CARE top
Promenade
Medical Office
Silverado Alzheimer Patient Center
Conversion of Psychiatric Hospital to Alzheimer's Patient Center
Encinitas, CA
Mechanical
Design: Heating, ventilation and air conditioning load
calculations for remodeled areas. Coordination and layout for
design of ductwork, supply air diffusers and return air grills
for effected remodel areas. Layout thermostat for applicable
new or remodel zones. Ductwork and piping risers as needed.
Coordination with architectural and structural to establish
preliminary duct sizes and available duct sizes for new and
remodel spaces. Redesign of return air in corridors to comply
to comply with current mechanical code. Provide fire/smoke damper
for all supply registers and exhaust grills in corridors.
Plumbing Design: Design of sewer and domestic
water for all new plumbing fixtures. Water, waste, vent and
natural gas sizing calculations as required by building department
plan check Design of floor plans for domestic hot and cold water,
waste, vent and natural gas for all new fixtures. Design sanitary
sewer, waster and vent riser diagrams for new and remodel. Equipment
schedules, fixture list and plumbing design layout details.
Investigate existing grease interceptor design and layout from
existing plans and recommend possible new design solution.
San Carlos Medical Center
La Mesa, CA
Scope of work
was to design a complete Plumbing Design System. Such as: Sewer
Distribution, Grease interceptor, Medical Air System, Vacuum
Air System, Oxygen System, Water Distribution, Gas Distribution
and coordination with HVAC Equipment and their Condensate System.
CLINICS
top
Kaiser Permanente
Escondido, CA
Mechanical
Design: Heating, ventilation and air conditioning load
calculations. Coordination and layout for design of ductwork,
supply air diffusers and return air grills. Layout of thermostat
and applicable zones. Exhaust for restrooms as required. Ductwork
and piping risers as needed. Layout of air conditioning systems
and condensate drain piping design as needed. Equipment schedule
and mechanical design details.
Plumbing Design: Design of sanitary sewer and domestic
water to five feet outside of the building. Water, waste, vent,
and natural gas sizing calculations as required by building department
plan check requirement. Design of floor plans for domestic hot
and cold water, waste, and natural gas. Design waste and vent
riser diagrams. Equipment schedules, fixture list and plumbing
design details.
Electrical Design: Electrical load calculations.
Lighting consultation to establish buildings lighting parameters
and required controls. Panel, equipment schedules, and single
line diagram. Coordination with architectural and mechanical systems
to provide power and/or conduit diagrams.
Vista Medical Clinic
Vista, CA
LECE performed
Mechanical, Electrical, Plumbing engineering, Heating, Ventilation
and Air conditioning load calculations. Coordination and layout
for design of ductwork, supply air diffusers and return air grills.
Layout of controls, thermostat and applicable zones. Exhaust for
conference rooms, kitchens and restrooms as required. Ductwork
and piping risers as needed. Layout of air conditioning systems
and refrigeration piping design as needed. Equipment schedule
and mechanical design details. Coordination with architectural
and structural to establish preliminary duct sizes, available
duct sizes and available scaled diagrammatic routes for ducts.
Incorporate comments by acoustical engineer's review as applicable.
Provided cut sheet of equipment, exposed grills, registers, louvers,
etc. Visited the site to verify existing conditions within 5 feet
outside of the proposed building. Design of sanitary sewer and
domestic water to five feet outside of the building or points
of connection to existing. Designs were in coordination with the
site civil design. Water, waste, vent, and natural gas sizing
calculations as required by building department plan check requirement.
Design of floor plans for domestic hot and cold water, waste,
vent and natural gas. Sizing of condensate drains and design layout.
Sizing and layout of rain water roof and ovrflow drains to five
feet outside of building. Design sanitary sewer, waste and vent
riser diagrams. Equipment schedules, fixture list and plumbing
design details. Cut sheets of fixtures. Title-24 building standards
set up by the state energy commission will be in effect on this
project. Title-24 forms and calculations. One site visit to review
existing conditions on site. Utility coordination with governing
supply agencies and owner provided existing record documents.
We had one meeting to discuss appropriate electrical and mechanical
equipment options. Lighting consultation to establish building
lighting parameters and controls required. Lighting consultation
to establish exterior site and parking lot parameters and controls
required. Fixture, panel, equipment schedules, single line diagram
and product literature cut sheets as required. Coordination with
architectural and mechanical systems to provide power and/or conduit
diagrams. Computer and telephone locations per owner's request.
PHARMACEUTICALS
top
Scripps Beckman
San Diego,CA
We performed
HVAC Design for laboratories, office space and conference rooms
utilizing central plant HVAC systems. It included an 800 ton chiller,
boiler and cooling tower. This large building included many laboratories
with fume hoods, process piping, several offices and conference
rooms.
|