CASINO top
San
Manuel Indian Bingo and Casino
Highland, CA
Mechanical Design:
Central Plant calculations for 160,000 sf casino projections.
Design of HVAC system, distribution and specifications to provide design/build bidder.
Review of design/build work.
Title 24 calculations.
Submittal review and construction on-sites.
Electrical Design: Loads and requirements for casino projections and generator. Design of electrical system, distribution and specifications. Electrical lighting plan. Power plan. Video power plan. Low voltage plan. Panel board schedules and risers. Electrical schedules. Electrical details. Electrical EMS. Submittal review and on-sites.
Plumbing Design: Plumbing floor plan and details. Roof drainage plan and schedules. Isometrics and schedules. Submittal review and on-sites.
Structural Design: Review pre-engineered calculations
and drawings. Coordinate to comply with CA codes. Review loads
for mechanical design. Provide foundation plan and details for
42,000 sq. ft. building.
HOTELS top
Quality Suites Hotel
San Diego, CA
LECE completed the mechanical and plumbing design for the four-story hotel as well as completing the power and lighting distribution design, to include parking and outside lighting.
Quiet and energy efficient package terminal units were selected per room. We used the split system for the lobby, meeting areas and hallways. Two high efficiency boilers were used: one on each side of the building, with re-circulating pumps to maintain the energy efficient hot water at all times.
Southern Hotel
San Diego, CA
Renovation of heating system for 5-story downtown hotel. Conversion from old hydraulic system to high efficiency electric.
Holiday Inn Hotel
Merced, CA
240-unit hotel with high-rise tower, 20,000 sq. ft. convention facility and restaurant.
OFFICEStop
ITLS Office Building
Tenant Improvement
Carlsbad, CA
Mechanical
Design: Redesigned existing HVAC equipment and ductwork
layout to accommodate two separate tenant spaces. We completed
coordination and layout for design of new ductwork, supply air
diffusers and return air grills. Provided the layout of new
thermostat and applicable zones, exhaust for conference rooms,
kitchens and restrooms. Ductwork and piping risers as needed.
Layout of new air conditioning zones as needed and coordination
with architectural and structural consultants to establish preliminary
duct sizes and available duct sizes and available scaled diagrammatic
routes for ducts. Provided a registered engineer's stamp and
signature on all mechanical drawings.
Electrical Design: Modified the existing building
service to separate meters for two tenants. Revised the existing
space to accommodate separation. Performed Title-24 calculations.
Provided panel diagrams, single line diagram and coordinated
with mechanical systems to provide power and/or conduit diagrams.
Provided power for relocated computer room. Coordinated all
work with other related consultants as required, made all necessary
plan check corrections to electrical drawings and energy code
compliance documentation and provided a registered engineer's
stamp and signature on all electrical drawings.
Sunrise Jewelry Manufacturing Company
Chula Vista, CA
Design of
central plant 4 pipe HVAC system for 42,000 sq. ft. jewelry
manufacturing company. Scope of design services included central
HVAC system to utilize chillers, boilers, cooling towers, chilled
& hot water supply and return layouts, fan coils, exhaust-fans,
fume hoods and dust collection design. This facility had office
spaces, manufacturing and processing spaces, lunchroom, laundry
room, security room, etc.
Saxony Road Office Building
San Diego, CA
Provided
drawings showing mechanical equipment size and location and
equipment schedule that has been installed for the above project.
Provided a registered engineer's stamp and signature. Provided
Title 24 energy calculations. Coordinated all work with architects
and the other related consultants as required. Made all necessary
plan check corrections to the mechanical drawings and energy
code compliance documentation.
California Institute for Human Sciences
Encinitas, CA
Completed
mechanical design services including heating, ventilation, air
conditioning, and plumbing for 20,000 sq. ft. of office space,
classrooms, and conference rooms. We also provided the electrical
design, including lighting design and power distribution for
entire building and site lighting. Designed the split system
air conditioning for classrooms and conference rooms with individual
thermostat in order to have better temperature control and a
higher comfort level. Duct liners were used in supply and return
plenum to minimize any sound from fan coil units. We placed
the heat pumps on the roof in a hidden area. Large package units
were used for high ceiling entrance areas. Our Title-24 Energy
Calculation confirms the compliance with building codes and
the California Energy Commission.
Grantville AHU replacement
San Diego, CA
Performed
load calculations per HVAC zone. Designed computer room to have
it's own independent air conditioning. We combined small zones
such as lunchrooms into one larger zone per owner request &
went on one site visit.
Loma Linda Facilities Medical Offices
Loma Linda, CA
Designed
power and lighting for the remodeling of the pathology, neurology
and orthopedic offices and labs.
Palomar National Corporate Offices
Carlsbad, CA
50,000 sq.
ft. new building including light manufacturing and warehouse.

Herschell Ave. Offices
La Jolla, CA
Mechanical
& plumbing design of 20,000 sq. ft. office space to include
ventilation for parking garage.
RETAILtop
Lowe's
Home Improvement Center
Orcutt, CA
Mechanical
Design: Heating, ventilation and air conditioning load
calculations. Layout of thermostat and applicable zones. Exhaust
for break room and restrooms as needed. Layout of air conditioning
systems and refrigeration piping design as needed. Equipment schedule
coordination with architectural and structural to establish duct
sizes, supply, and return opening duct sizes and available scaled
diagrammatic routes for ducts in office area.
Plumbing Design: Design of sanitary sewer and domestic water to five feet outside of the building. Design will be in coordination with the site civil design. The civil engineer will extend these utilities to "point of connection" at existing mains. Water, waste, vent and natural gas calculations as required by building department plan check requirement. Design of floor plans for domestic hot and cold water, waste vent and natural gas. Sizing of condensate drains and design layout. Design sanitary sewer, waste and vent riser diagrams. Equipment schedules, fixture list and plumbing design details. Cut sheets of fixtures.
Electrical Non-Residential Title 24 Energy Calculation: Title 24 building standards set up by the state energy commission will be in effect on this project, Title 24 forms and calculations.
Electrical Design: Appropriate electrical and mechanical equipment and optional sales area, office and toilets lighting plan. Conduit and raceway plan. Grounding and bonding details. Lighting fixture schedule, panel, equipment schedules, single line diagram and details. Coordination with mechanical systems to provide power and or conduit diagrams. Computer and telephone locations per owner's requests.
Margaret Retail Project
San Diego, CA LECE
provided drawings of the HVAC, plumbing and electrical design
to be installed for Margaret's Cleaners projects. The drawings
are in Autocad format R14. We provided a registered engineer's
stamp and signature on all HVAC plumbing and electrical drawings.
We also wet stamped and signed up to six print sets required for
plan check and permits. LECE coordinated all work with Architects
and other related consultants as required. Made all necessary
plan check corrections to the HVAC plumbing and electrical drawings
generated by Leading Edge consulting engineers.
RECREATION/SPORTS FACILITIES top
Fitness Now
Oceanside, CA
Conversion of 40,000 sq foot Payless Drugstore to state-of-the-art fitness center to include offices, weight room, aerobic room, physical therapy, kids clubroom.
Primo Salon & Day Spa
Chula Vista, CA
We converted the plumbing design for 10,000 sqare feet of the hair salon to include sinks, tubs, massage room, etc.
RESTAURANTStop
Margarita Rocks
Restaurant and Nightclub
Oceanside, CA
Mechanical
Design: Heating, ventilation, and air conditioning load
calculations. Coordination and layout for design of ductwork,
supply air diffusers and return air grills. Layout of controls,
thermostat and applicable zones. Exhaust and make-up air for kitchen,
hood and restrooms as required. Ductwork and piping risers as
needed. Layout of air conditioning systems and refrigeration piping
design as needed. Equipment schedule and mechanical design details.
Coordination with architectural and structural to establish preliminary
duct sizes and available duct sizes and available scaled diagrammatic
routes for ducts.
Plumbing Design: Site visit to verify existing conditions.
Design of sanitary sewer and domestic water to five feet outside
of the building or points of connection to existing. Water, waste,
vent and natural gas sizing calculations as required by building
department plan check requirement. Design of floor plans for domestic
hot and cold water, waste, vent and natural gas. Sizing of condensate
drains and design layout. Design of sanitary sewer, waste, and
vent riser diagrams. Equipment schedules, fixture list and plumbing
design details. Cut sheets of fixtures.
Electrical Design: Electrical load calculations. Lighting consultation to establish building lighting parameters, and controls required. Panel, equipment schedules, single line diagram. Coordination with architectural and mechanical systems to provide power and/or conduit diagrams.
Pacifica in the Desert
Palm Desert, CA
Mechanical
Design: Review existing equipment system and verify if
they are adequate for new use. Design and specify new system if
necessary. Heating ventilation and air conditioning load calculations
for shell building. Exhaust for restrooms as required. Provide
a registered engineer's stamp and signature on all mechanical
drawings.
Neighborhood House Kitchen
San Diego, CA
Mechanical
Design: Heating, ventilation, and air conditioning load
calculations. Coordination and layout for design of ductwork,
supply air diffusers and return air grills. Layout of controls,
thermostat and applicable zones. Exhaust and make-up air for kitchen,
hood and restrooms as required. Ductwork and piping risers as
needed. Layout of air conditioning systems and refrigeration piping
design as needed. Equipment schedule and mechanical design details.
Coordination with architectural and structural to establish preliminary
duct sizes and available duct sizes and available scaled diagrammatic
routes for ducts.
Plumbing Design: Site visit to verify existing conditions. Design of sanitary swere and domestic water to five feet outside of the building or points of connection to existing. Water, waste, vent and natural gas sizing calculations as required by building department plan check requirement. Design of floor plans for domestic hot and cold water, waste, vent and natural gas. Sizing of condensate drains and design layout. Design of sanitary sewer, waste, and vent riser diagrams. Equipment schedules, fixture list and plumbing design details. Cut sheets of fixtures.
Electrical Design: Electrical load calculations. Lighting consultation to establish building lighting parameters, and controls required. Panel, equipment schedules, single line diagram. Coordination with architectural and mechanical systems to provide power and/or conduit diagrams.
Boston Markets Restaurants
LECE performed Mechanical, Electrical and Plumbing design for new Boston Markets in Southern California.
Pizza Hut
Santa Rosa & Woodland, CA
3,000 to 4,000
sq. ft. remodels of existing buildings to Pizza Hut Restaurants;
Power & lighting distribution design.
RELIGIOUS BUILDINGStop
Saint Dunstan's Church
El Cajon, CA
Mechanical
Design: Heating, ventilation and air conditioning load
calculations. Coordination and layout for design of ductwork,
supply air diffusers and return air grills. Layout of controls,
thermostat and applicable zones. Exhaust for conference rooms
kitchens and rest rooms as required. Ductwork and piping risers
as needed. Layout of air conditioning systems and refrigeration
piping design as needed. Equipment schedule and mechanical design
details. Coordination with architectural and structural to establish
preliminary duct sizes and available duct sizes and available
scaled diagrammatic routes for ducts. Review and adjust documents
if required based on cost prepared by contractors on design development
documents. Incorporated comments by Acoustical engineer's review
as applicable. Provide out sheet of exposed grills, registers,
louvers, etc.
Plumbing Design: Site visit to verify existing conditions
within five feet outside of the proposed building. (Civil survey
and engineering is not part of this proposal) Design of sanitary
sewer and domestic water to five feet outside of the building.
Design will be in coordination with the site civil design. The
civil engineer shall extend these utilities to "point of existing
connection" at existing mains.
Electrical Non-Title 24 Energy Calculations: Title 24 building standards set up by the state energy commission will be in effect on this project. Title 24 forms and calculations.
Electrical Design: Utility coordination with governing supply agencies and owner provided existing record documents. Lighting consultation to establish building lighting parameters budget and controls required. Fixture, panel, equipment schedules, single line diagram and product literature cut sheets as required. Review and adjust documents for cost prepared by contractors based on design development documents. Coordination with architectural and mechanical systems to provide power and/or conduit diagrams. Computer and telephone locations per owner's requests. Conduit requirements as required for owner's security or sound system (Owner to furnish locations of required conduit).
Sunrise Community Baptist Church Conversion
El Cajon, CA
|