BIOTECH
top
The
Scripps Research Institute, Beckman Building
San Diego, CA
Performed HVAC Design for laboratories, office space and conference
rooms utilizing central plant HVAC systems. Included huge chiller,
boiler and cooling tower. Building included many laboratories
with fume hoods, process piping, several offices and conference
rooms. Minimum of 80% air change rate and state of the art fume
hoods were used for laboratories with significant energy saving
for unoccupied period and night times. Mechanical construction
budget was at $11,000,000.00.
UCSD-University
of California San Diego
Basic Science Building
HVAC
retrofit design for the UCSD Basic Science building. Redesigned
HVAC supply, return and exhaust air flows for all laboratories
and offices. Some offices converted into lab and vice versa.
Internal heating, cooling load and exhaust requirements changed
dramatically compared to original design. Resizing of duct work
and fume hoods and complete air balance of each laboratory and
office space. Room by room heating /cooling load and exhaust
requirement was performed by Trace program.